Railway Accounts Department Examinations

Showing posts with label Gross Million Tonne. Show all posts
Showing posts with label Gross Million Tonne. Show all posts

Tuesday, October 15, 2024

GMT - Gross Million Tonne - Statistics in IR

 


GMT - Gross Million Tonne (Statistics in IR)

What is GMT ? 

  • Gross = Total Load i.e., Carrying Capacity (Tare Load + Payload) 

  • Million = 10 Lakhs

  • Tonne = 1000 Kgs 

  • I.e., 100 Crores Kgs  or 1 Million Tonne 

  • GMT is a primary performance metric   - serves 3 groups of Railway Statistics in IR Statistics Manual i.e., 1. Economic Statistics 2. Transportation Statistics & 3. Administrative Statistics. 

  • GMT data of every train on every line  - captured on FOIS / ICMS / CoA

  •  FOIS stands for Freight Operations Information System 

  • ICMS stands for Integrated Coaching Management System

  • CoA stands for Control Office Application

  • Traffic Density Data (GMT)  - an integral part of Indian Railways IT Systems architecture. 

Why GMT is important: GMT data is a crucial decision criterion for 

  • Planned Track Renewals 

  • Preventive maintenance (like periodicity of USFD - Ultrasonic Flaw Detection) 

  • Riding quality (Track degradation model) 

  • Effective allocation of rails, track materials & resources, among works/projects under Plan Heads 11 - New Lines, 15 - Doubling & 31 - Track Renewals.

Existing mechanism (up to 2022-23) - calculation of GMT 


  • Computed by Zonal Railways 

  • Basis is GTKM & Lead (Kms) 

  • Manually input in TMS - Track Management System 

  •  Limitation is for sections with more than 2 lines (i.e., 3rd/4th line), the line wise GMT data is not available.  


New mechanism - from 2023-24 onwards   - calculation of GMT 


  • Zonal Railways would provide GMT data by May of the following year.  Example: For 2023-24 the data should be available by May 2024 and so on. 

  • All GMT data in TMS  - sync (API based) with the systems architecture

  • API stands for Architecture Programming Interface

  • No physical copies. No manual input in TMS - Track Management System

  • No signed copies in parallel 

  • GMT data from FOIS/ICMS/CoA would flow daily into TAMS - Traffic Accounts Management System   ( SMRTI - Statistical Module on Rail Transport Information) 

  • From TAMS to TMS 

  • From 2024-25 onwards - GMT data - refined format i..e, Block section wise Line wise  (earlier line was not available) 

  • Zonal Railways Statistical Units (under PFA)  - issue Monthly & Annual GMT Data

  • SPOC for Statistical Information Module   - GM/TAMS @ CRIS 

  • SPOC for input data of FOIS/ICMS/CoA - GM/OR @ CRIS

  • SPOC stands for Single Point of Contact 

  • It is calculated for Railway Tracks involving multiple factors and is a complex process. 

  • It is determined through detailed engineering analysis and simulation. 


GMT Calculated for Railway Tracks involving multiple factors.  These are: 


  1.  Axle Load: Higher axle loads leads to greater wear and tear. 

  2. Train Speed: Higher speeds can cause track degradation. 

  3. Train Frequency: The number of trains passing over a track within specified time (Line Capacity) can affect stress & wear on the track. 

  4. Track structure & Material: Ballasted or non-ballasted track and the material used play a significant role in determining load capacity & maintenance requirements. 

  5. Climate & weather: Extreme temperature or heavy rainfall conditions impact the Track’s durability. 

  6. Track maintenance practices: Frequency of track maintenance influences the overall track performance. 


Note: The above instructions are in supersession of any previous instructions on the subject (GMT) and in the event of conflict with any other instructions / part of any other instructions, the above instructions would prevail. 


Key points -  GMT 


  1. GMT is a primary performance metric   - serves 3 groups of Railway Statistics in IR Statistics Manual i.e., 1. Economic Statistics 2. Transportation Statistics & 3. Administrative Statistics. 

  2. Statistical units in Zonal Railways - under control of PFA 

  3. GMT  - Revised policy   w.e.f 01.4.2024 onwards  (or FY 2023-24 onwards) 

  4. GMT means Traffic Density Data 

  5. GMT data from FOIS/ICMS/CoA would flow daily into TAMS - Traffic Accounts Management System   ( SMRTI - Statistical Module on Rail Transport Information) 

  6. From TAMS to TMS  

  7. No physical copies.  No signed copies.  No manual input in TMS 

  8. From 2024-25 onwards - GMT data - refined format i..e, Block section wise Line wise  (earlier line was not available) 

  9. Zonal Railways Statistical Units (under PFA)  - issue Monthly & Annual GMT Data

  10. SPOC for Statistical Information Module   - GM/TAMS @ CRIS 

  11. SPOC for input data of FOIS/ICMS/CoA - GM/OR @ CRIS 


Abbreviations 


  1. GMT  - Gross Million Tonne

  2. FOIS - Freight Operations Information System 

  3. ICMS - Integrated Coaching Management System

  4. CoA - Control Office Application

  5. USFD - Ultrasonic Flaw Detection

  6. TMS - Track Management System 

  7. GTKM - Gross Tonne Kilometer

  8. API - Architecture Programming Interface

  9. SMRTI - Statistical Module on Rail Transport Information 

  10. SPOC - Single Point of Contact 

  11. CRIS - Centre for Railway Information Systems


—-end—-