Buildings & Rents
Source: Chapter 19 of Engineering Code
No employee has any right to be provided with Quarters
Quarters provided by Railways - The following circumstances
Where conditions are such that Private enterprise does not adequately meet the demand for housing the staff.
It is necessary for special reasons to provide Quarters for certain staff near to their work (for example: staff working in remote location Railway Stations)
GM - Can divide the Quarters into separate classes as per the standard of accommodation approved for various classes of staff.
Railway Board - Have the power to prescribe the scale of accommodation and the unit cost of each class of quarters.
Motor garages - Should not as a rule be provided in staff quarters. Allowed only in exceptional cases i.e., essential in the interest of the official's work. In such cases, the cost of garages should be added to the capital cost of the quarters to assess the Rent.
Temporary Garages - The cost should not exceed Rs.10,000 /-
Assessed Rent of class of Quarters - 6% of the Capital cost of all the Quarters of the particular class.
Rent - Officers Quarters - Floor Area basis
Rent - Staff Quarters - Floor Area basis (wherever possible)
Rent - Assessed once in 5 years
Rent - To work out the details, 2 years is allowed.
Example: The Rent worked out based on the cost as on 31.03.2021 will be effected from 01.04.2023.
GM/DRM - Have full powers to incur the expenditure on Repairs to the Quarters. (Previously Rs.1 Lakh on Quarter subject to Rs.30 Lakhs per Annum. Now it is deleted)
Leased and Requisitioned Buildings - The rent paid to the Landlord should be treated as Assessed Rent
The Total Cost of the Quarters:
Inclusions:
The entire cost of construction irrespective of the source of finance
Sanitary fittings
Water Supply fittings
Electric Installation & Fittings
Exclusions:
Cost of Land
Development of Land (Raising, Levelling, Dressing, Construction of Revetments, retaining walls, compound walls, fences and gates, Approach Roads, Sewerage, Street lighting, Water supply arrangements, Over Head Tank, Transformer, etc)
Electric Bulbs: First cost from Railway Funds. Subsequent replacements are chargeable to the Occupants.
Provision of other special installations and fittings such as Heating installations, Electric Lifts, Refrigerators, and Furniture - Railway Board prior permission is required.
Hire Charges for Furniture
14% per annum for Durable articles - Beds, Almirahs, Chairs, Tables etc
24.75% per annum for Non Durable articles - Door mats, curtains, mattresses, durries (carpets), chicks (stools), etc
Obligation of Tenants:
Any additions or alterations to quarters with permission of the Executive Engineer in charge only.
Keep their Quarters in a clean and wholesome state.
Service Buildings:
Examples: Railway Stations, Offices, Depots, Workshops, Running Rooms, Guest Houses for Officers and subordinate staff
No Rent is chargeable
Temporary use of Rest houses etc as Residence - DRM has powers
No Rent - Accommodation provided for the Officers of Government Inspectors of Railways or for Statutory Audit Officers
List of Buildings:
Maintaining a complete and up-to-date list of all Buildings
Both Residential and Service
Form: E 1977
Division wise
Reviewed by the Divisional Engineer once in every 3 Months
Rent Rolls:
Prepared in Triplicate (Personnel Dept, Accounts Dept and Office Copy)
Prepared on the beginning of the Financial Year i.e., 1st April
Information of Quarters, Occupants, etc
Form: Chapter 16-A of the Engineering Code
Key Points for MCQ:
Buildings & Rents - Chapter 19 of the Engineering Code
No employee has any right to be provided with Quarters
Assessed Rent of class of Quarters - 6% of the Capital cost of all the Quarters of the particular class. (whether the Total cost is charged to Capital or any other Source of Finance)
Rent - Assessed once in 5 years
Rent - To work out the details, 2 years is allowed.
Example: The Rent worked out based on the cost as on 31.03.2021 will be effected from 01.04.2023.
Rent - Officers Quarters - Floor Area basis
Rent - Staff Quarters - Floor Area basis (wherever possible)
GM/DRM - Have full powers to incur the expenditure on Repairs to the Quarters.
Temporary Garages - The cost should not exceed Rs.10,000 /-
Electric Bulbs: First cost from Railway Funds. Subsequent replacements are chargeable to the Occupants.
Hire Charges: 14% per annum for Durable articles - Beds, Almirahs, Chairs, Tables etc
Hire Charges: 24.75% per annum for Non Durable articles - Door mats, curtains, mattresses, durries (carpets), chicks (stools), etc
Rent is not chargeable to Service Buildings like Stations, Offices, Workshops etc
Temporary use of Rest houses etc as Residence - DRM has powers
No Rent - Accommodation provided for the Officers of Government Inspectors of Railways or for Statutory Audit Officers
Form: E 1977 - List of Buildings
List of Buildings - Reviewed every 3 months.
Rent Rolls - Prepared in Triplicate (Personnel Dept, Accounts Dept and Office Copy)
Rent Rolls - Prepared at the beginning of the Financial Year i.e., 1st April
End