RRTS
Website: https://ncrtc.in
Background:
Task force - 2005 - by Planning Commission - Chairman is Secretary, Ministry of Urban Development (MoUD) - to develop multi modal transit system for NCR - National Capital Region of Delhi
Identified 8 Corridors.
Priority: 3 Corridors i.e., 1. Delhi – Ghaziabad – Meerut Corridor 2. Delhi – Gurugram – SNB – Alwar Corridor 3. Delhi - Panipat
Other 5 Corridors are 4. Delhi – Faridabad – Ballabgarh - Palwal
5. Ghaziabad – Khurja 6. Delhi - Bahadurgarh - Rohtak
7. Ghaziabad-Hapur 8. Delhi-Shahdara-Baraut
NCRTC
Stands for National Capital Region Transport Corporation
Developed the RRTS
Joint venture of Central Government and 4 State Governments i.e., Delhi, Haryana, Rajasthan & UP
MOU - Memorandum of Understanding - among Central Govt and 4 State Govts - 2011
Incorporated as a Registered Company in 2013
Logo: comprises 2 elements. The word marked NCRTC and an arrowhead made up of polka dots ( Round dots repeated to form a regular pattern).
Polka dots symbolically represent the stakeholders i.e., Govt, Institutions, People etc for a common goal of balanced and sustained regional development through connectivity.
Fast moving arrow represents speed and forward movement in the direction of progress and improvement in the quality of the citizen.
RRTS:
RRTS stands for Regional Rapid Transit System
RRTS - a State of the art regional mobility solution, comparable to the best in the World.
Delhi - Ghaziabad - Meerut - 82 KMs - 24 Stations Fully operational by 2025 - Will cover in 60 Minutes - First RRTS project in India
First phase - 17 KMs - 5 Stations i.e., Sahibabad, Ghaziabad, Guldhar, Duhai & Duhai Depot - Opening on 20.10.2023
Called as RapidX
Namo Bharat Train - Name of Trains in RRTS
Operational Speed - 160 KM Per hour (Against 80 KM per hour in Metro Trains)
PM Gatishakti National Master plan - Multi modal integration at RRTS stations with Indian Railways, Delhi Metro, Airports & Bus stands.
Delhi - Meerut - Funded by 1. ADB - Asian Development Bank 2. New Development Bank & 3. Asian Infrastructure Investment Bank
Cost - Rs. 30,000 Crores
More women employees compared to Men
A dedicated “Lost and Found Centre” at Ghaziabad - to expedite the retrieval of misplaced belongings
Frequency: Every 15 Minutes . It was designed to run at a frequency of every 5 minutes in case of more demand.
PSD - Platform Screen Doors
Isolate the platforms from the track.
Will open only when the train stops at the correct position.
Will be synchronously controlled throughout the Platform and operate in synchronization with the Train Doors.
So it prevents accidents, objects falling on track and trespassing.
Speed:
Design - 180 KM per hour
Operation - 160 KM per hour
Average - 100 KM per hour
RRTS is Different:
From Metro - Longer distance, Fewer stops & Higher speed
From Indian Railways - Reliable, high frequency, point to point to regional travel at high speed & Dedicated pathway
Objects of RRTS
Boosting economic activity
Provide improved access to employment, education & healthcare opportunities
Significant reduction of air pollution
Features of RRTS Train Sets:
Overhead luggage racks
Wi-Fi
Mobile & Laptop charging facility at every seat
Vending machine facility
Premium class car - More legroom, wider seats, Coat hangers etc
Key points for MCQ:
RRTS stands for Regional Rapid Transit System
NCRTC stands for National Capital Region Transport Corporation
MoUD stands for Ministry of Urban Development
PSD stands for Platform Screen Door
MOU stands for Memorandum Of Understanding
Total Corridors - 8
NCRTC - Joint venture of Central Government and 4 State Governments i.e., Delhi, Haryana, Rajasthan & UP
Delhi - Meerut RRTS called as RapidX
—---End—---
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.