Chenab - World’s Highest Railway Bridge
Part of USBRL - The Udhampur-Srinagar-Baramulla Rail Link Project (345 kms)
1.3 KM length
Height 359 Meters - Taller than Eiffel Tower (330 Meters) - Similar to 85 storey tower
Expected to run the Trains in 2024
The connector between Kashmir and the rest of India
Built to sustain earthquakes measuring up to 8 on the Richter scale.
Executed by the KRCL - the Konkan Railway Corporation Limited
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.