MCQ on GCC for Works, 2020
July
Click for GCC for Works, 2020 July
By M Nageswara Rao
9492432160
Dated: 08.08.2021
S.No |
Multiple Choice Questions |
Answer |
1. |
The first and foremost document in the Order of Precedence
of Documents as Per 1.01 of GCC for Works, 2020 July is _____ A. IR Standard GCC updated with
correction slips issued up to the date of inviting Tender B. Special Conditions of Contract C. Letter of Award D. Schedule of Items, Rates &
Quantities |
C |
2. |
Limited Tenders shall mean Tenders invited from all or
some contractors on _________ A.
Approved
List of Contractors with the Railway B.
Select
List of Contractors with the Railway C.
Either
A or B D.
Neither
of above |
C |
3. |
Contractor’s authorized Engineer shall mean ________ A.
More
than 3 years’ experience – Relevant field – Approval of Engineer. B.
More
than 5 years’ experience – Relevant field – Approval of Engineer. C.
More
than 3 years’ experience – any field – Approval of Engineer. D.
More
than 3 years’ experience – Relevant field – Approval of Engineer not
required. |
A |
4. |
List of Approved Contractors in Railway shall be revised
periodically once in a ______ . A.
2
Years B.
3
Years C.
6
Months D.
1
Year |
D |
5. |
Date of inviting Tender shall be reckoned as ______ A.
Date
of publishing Tender Notice on IREPS Website (if published on Website) B.
Date
of Publication in Newspaper (in case Tender is not published on Website) C.
Either
A or B D.
None
of these |
C |
6. |
Notices shall be sent to the Contractors in the Approved
list of Contractors through __________ A.
Registered
e-mail address B.
Registered
Postal address C.
Either
A or B D.
Both
A & B |
D |
7. |
The EMD shall be
rounded to the nearest ________ A.
Rs.100 B.
Rs.10 C.
Rs. 1000 D.
No such Rounding off |
A |
8. |
Which one among the following is incorrect? A.
EMD is 2% of
the value of work, if the work value is up to Rs. 1 Crore B.
If value of
work is beyond Rs. 1 Crore, the EMD is Rs.2 Lakh plus 0.5 % of the excess of the estimated cost of work
beyond Rs. 1 Crore subject to maximum of Rs. 1 Crore C.
EMD of
successful tenderer is retained as part of SD - Security Deposit D. EMD is applicable to Open Tenders only |
D |
9. |
Firms recognized by
____________ as "STARTUPS" shall be exempted from the payment of
EMD. A. Ministry of Commerce & Industry B. Dept
for promotion of Industry and Internal Trade C. Railway
Board D. Dept
of Industrial Policy & Promotion (DIPP) |
D |
10. |
Which one among these is not a valid reason for forfeit of
EMD by the Railways. A.
Resile/abandon
the work by successful tenderer. B.
Fails to
submit the PG - Performance Guarantee within validity of time. C.
Fails to
submit the SD - Security Deposit within validity of time. D.
Modify the
terms & conditions thereof in a manner not acceptable to the Railways. |
C |
11. |
The payment mode of EMD is
______ A.
Deposited in Cash through e-payment gateway or as
mentioned in Tender Documents B.
As mentioned in Tender Documents only C.
Deposited in Cash through e-payment gateway only D. Deposited
in cash at Railway Cash Office or though e-payment gateway |
A |
12. |
RCM stands for ______________ A.
Reverse Charge Method B.
Reverse Charge Mechanism C.
Retain Charge Mechanism D. Reverse
Credit Mechanism |
B |
13. |
Work Orders for works not exceeding_______ shall be issued under the agreement for
Zone Contracts. A. Rs. 1 Lakh B. Rs. 5 Lakh C. Rs. 10 Lakh D.
Rs.
50 thousand |
B |
14. |
No Technical & Financial credentials/eligibility
criteria are required for Tenders having value up to ______ A. Rs.25
Lakhs B. Rs.
2 Crores C. Rs.
5 Crores D. Rs.
50 Lakhs |
D |
15. |
Financial Eligibility – Tenderer must have received
contractual payments in the ______________________ at least 150 % of the
advertised value of the Tender. A. Previous 7 financial years and the
current year up to the date of inviting the Tender B. Last 7 years ending last day of
month previous to one in which the Tender is invited C. Previous 3 financial years and the
current year up to the date of inviting the Tender D.
Last
3 years and the current year up to the date of inviting the Tender |
C |
16 |
Technical Eligibility – Tenderer must have completed the
similar works (3 works & each 30 % of advertised value or 2 works &
each 40 % of advertised value or 1 work & each 60 % of advertised value)
during the __________. A.
Previous
7 financial years and the current year up to the date of inviting the Tender B.
Last
7 years ending last day of month previous to one in which the Tender is
invited C.
Previous
3 financial years and the current year up to the date of inviting the Tender D.
Last
3 years and the current year up to the date of inviting the Tender |
B |
17 |
On found any information submitted by the Tenderer is
false or forged or incorrect, the consequences are i) Forfeiture of EMD, PG
& SD available with the Railway ii) Forfeiture of Other dues to be paid
to the Contractor if any under this Contract iii) Banned for awarding the
Contract for a period up to 5 years
iv) Impose the fine of 2 % of the Contract Value A. Consequence i) only B. Consequences i) & ii) C. Consequence iv) only D. Consequence i), ii) & iii) |
D |
18 |
Bid Capacity is required for the Tenders valued above
__________ A. Rs. 20 Crores B. Rs. 2 Crores C. Rs. 5 Crores D.
Rs.
100 Crores |
A |
19 |
Bid Capacity formulae is __________ A. {A x N x 2} - B B. {A x N x 3} - B C. {A x N x 2} + B D.
{A
x N x 3} - B |
A |
20 |
The Contract documents shall be signed in ______ by the
Railway and the Contractor A. Duplicate B. Triplicate C. Quadruplicate D.
Quintuplicate |
B |
21 |
Temporary Works means (as per GCC for Works) _______ A.
Required
for the completion of the Works B.
Required
for the maintenance of the Works C.
Works
which are completed in the period of Two months D.
Both
A & B above |
D |
22 |
In case Non-Railway bodies/persons are permitted to use
Railway premises with competent authority’s approval, the following charges may
be levied from time to time. A. Conservancy Charges B. General charges C. Way Leave Charges D.
Lease
charges |
A |
23 |
In case of Subletting of Works, total value of work to be
assigned to Sub Contractor (s) shall not be more than ______ of Total contract Value. A. 20 % B. 30 % C. 50 % D.
75
% |
C |
24 |
Security Deposit can be permitted by depositing Bank
Guarantee Bond – subject to i) Contracts value Rs.50 Crores or above ii)
after execution of Contract documents
iii) before execution of Contract documents iv) before payment of 1st
on account bill v) Irrespective of Contracts value A. i) , ii), iv) B. iii), iv), v) C. i) iii), iv) D.
None
of the above |
C |
25 |
Total number of Documents in the Order of Precedence as
per 1.01 of GCC for Works, July 2020 is ____ A. 10 B. 11 C. 12 D. 9 |
B |
26 |
PG – Performance Guarantee shall be submitted within ____
from the date of issue of LOA – Letter of Acceptance A. 21 days B. 30 days C. 7 days D. 60 days |
A |
27 |
Extension time for submission of PG beyond ____ and up to
________from the date of issue of LOA A. 21 days & 60 days B. 30 days & 90 days C. 7 days & 21 days D. 60 days & 120 days |
A |
28 |
Penal interest charged for delay
submission of PG is ______ A. 10 % Per Annum B. 12 % Per Annum C. 15 % Per Annum D. 18 % Per Annum |
B |
29 |
PG shall be initially valid up to
the stipulated date of completion of work plus _______ A. 30 days B. 0 days C. 60 days D. 90 days |
C |
30 |
Additional PG amounting to 5% for
the excess value over the original contract value, if value of the contract
increases by more than ______ of the Original Contract value. A. 10 % B. 15 % C. 20 % D. 25 % |
D |
31 |
PG shall be released to the
Contractor after A. Completion of Physical Work B. Completion of the Physical Work
plus 60 days C. Completion of the Physical Work
& Maintenance Period if any D. None of the above |
A |
32 |
Variations: Quantities operated
beyond 125 % but up to 140 %, Rates to be paid at A. 96 % of the rate B. 98 % of the rate C. 100 % of the rate D. None of the above |
B |
33 |
Variations: Quantities operated
beyond 140 % but up to 150 %, Rates to be paid at A. 96 % of the rate B. 98 % of the rate C. 100 % of the rate D. None of the above |
A |
34 |
Variations: Quantities operated
beyond 150 %, Rates to be paid at A. Will be avoided. But 96 % of the
rate paid at exceptional unavoidable circumastances B. Not permitted at all C. Will be avoided. But 90 % of the
rate paid at exceptional unavoidable circumastances D. None of these |
A |
35 |
Base month for PVC – Price
Variation Clause shall be taken as ____ A. Month 28 days prior to the opening
of Tender incl: extensions, if any B. Month 28 days prior to the opening
of Tender excl: extensions if any C. Month 14 days prior to the opening
of Tender incl: extensions, if any D. Month 15 days prior to the opening
of Tender excl: extensions, if any |
A |
36 |
Labour component as per PVC is
_____ A. 15 % B. 20 % C. 30 % D. 25 % |
B |
37 |
Sole Arbitrator is appointed in
claims not exceeding the value of _____ A. Rs. 50 Lakhs B. Rs. 1 Crore C. Rs. 5 Crore D. Rs. 10 Crore |
B |
38 |
Sole Arbitrator shall be appointed
within ______ from the day when a written and valid demand for Arbitration is
recd. by the GM A. 30 days B. 45 days C. 60 days D. 15 days |
C |
39 |
Serving Gazetted Railway Officers
of not below _____ and Retired Railway Officers not below _______ one year after his/her date of
Retirement A. Sr.Scale & JA Grade B. JA Grade & JA Grade C. JA Grade & HAG Grade D. None of the above |
D |
40 |
Contractor shall be entitled for a
Bonus of ____for each 30 days early completion of Work A. 1 % B. 2 % C. 3 % D. 4 % |
A |
41 |
Maximum Bonus shall be limited to
______ of Original Contract Value A. 2 % B. 5 % C. 3 % D. 10 % |
C |
42 |
Bonus for early completion of work
in Open Tenders is applicable for works valuing above ________ A. Rs.10 Crore B. Rs. 20 Crores C. Rs. 5 Crore D. Rs. 50 Crore |
B |